BAYNARD HOUSE SHAFT RELOCATION
BETTER BY WATER
PROJECT DETAILS
When: November 2014 – April 2016
Where: Baynard House, Blackfriars
The civil engineering arm of Livett’s Group began work at Baynard House, Blackfriars in November 2014 to assist BAM Nuttall in the relocation of the water cooling intake shaft for British Telecom.
This operation continued up until April 2016, culminating in the removal of the sheet piles from the river.
PROJECT VIDEO
HOW LIVETT'S MADE IT HAPPEN
A cofferdam was constructed as engineers carried out the work in anticipation of the repositioning of the Blackfriars Pier downstream. With such extensive work taking place at the site throughout the project, a vast amount of bulky and unusual loads had to be transported to and from the Herbosch Kiere jack-up barge which moored alongside the cofferdam.
A marine logistics centre was established at Thames Wharf Silvertown in order to facilitate the frequent transportation of necessary civil engineering equipment via water, avoiding hundreds of lorry movements in central London.
As part of the de-rig of the operations at Baynard House, the cofferdam installed to carry out the works needed to be removed. Initially, this was attempted by the crane on the jack up barge, which failed owing to the sheet piles having sunk into the Thames’ riverbed.
From here, Scheldemond I was called into action. This vessel was ideal for the operation, as she has the necessary functionality to carry out the task – including spud legs to fix her into position, a deck big enough to manage all required equipment, and an on board HIAB crane capable of lifting the sheet piling onto her deck.
Divers working on the project used the Scheldemond I as a platform to both store all their essential equipment and as a platform to dive into the water and carry out the works. Gradually, large sections of the sheet piling were cut away and removed by the Scheldemond’s HIAB crane.
This removal happened very successfully over the course of two weeks.
Marine Coordinator Ed Livett commented: “The Scheldemond I once again showed her versatility and suitability for these types of jobs. Her ample deck space and on board HIAB was crucial in the successful operations at Baynard House.”
VIEW MORE OF THE LIVETT'S PORTFOLIO
- All
- Civil Engineering
- Film & TV
- Marine Logistics
- PR & Consultancy
- Superyacht Agency
- Tugs & Towage
The Woman In Cabin 10 – Marine Filming
London Eye Capsule Renewal
Hamnet – River Thames Filming
Avatar: Fire & Ash – River Thames Burning Sculpture
Shelter
The Family Plan 2
Barnes Bridge Maintenance & Strengthening Works
Mission: Impossible – The Final Reckoning
Back In Action
Sonic the Hedgehog 3
Blitz
The Union
Suspect – Series 2
Red Bull Tower Bridge Wingsuit Flight
The End We Start From
The Boys In The Boat
Amphibious Land Rovers on the River Thames
Cannon Street Railway Bridge Repainting
Meg 2: The Trench – River Thames Megalodon PR Launch
Hennessy x NBA – Courts Beyond Limits
TAG Heuer – eFoil Launch
Pistol
Lockwood & Co
Burberry Olympia Handbag Launch
Burberry Floating Meadow
Anatomy of a Scandal
Gangs of London – Series 2
Lotus Eletre Launch
The Boat Race 2022
Alexander McQueen – First Light
Liam Gallagher – Down By The River Thames
Gangs of London – Series 1
Amazon Prime – Premier League Launch
London SUP Open 2019 – City Paddle Festival
Radio Caroline Tow
Jaguar XF – High-Wire Thames Crossing
The 5th Wave
PS Tattershall Castle
Grimsby
Now You See Me 2
Sharknado 5
Candy Crush Soda Saga – Product Launch
Land Rover – Rugby World Cup Trophy Tour
Airbnb – River Thames Floating House
Santander 123 World Golf Stunt
Jaguar XE – Floating Thames Concert
eBay – Floating Birthday Cake
Under Armour – Earn Your Armour
Blackfriars Rail Bridge Reconstruction
Tall Ships Festival 2017
Lucky Man
Microsoft – Make It Happen Event
London Fire Brigade – Thames Zip Wire
National Lottery – New Dawn For Lotto
Jurassic World: Fallen Kingdom
Criminal
British Masters Hero Challenge Golf
CO2 Tanks Removal
Lady A & Lady M II