Cannon Street Railway Bridge Repainting
BETTER BY WATER
PROJECT DETAILS
When: March 2023
Where: Cannon Street
Vessels used: Artemis; Scheldemond I
Our client for this significant marine civil engineering project was BAM Nuttall, who were operating on behalf of Network Rail. The repainting of Cannon Street Railway Bridge represented not just a cosmetic enhancement to the bridge, but also served as a vital maintenance operation.
Here’s how we helped make it happen…
HOW LIVETT'S MADE IT HAPPEN
The objective was to repaint the underside of every arch of Cannon Street Railway Bridge. Regular repainting of bridges spanning the River Thames is crucial to help guard against corrosion, thus ensuring both the safety and aesthetic appeal of these integral structures.
To facilitate this challenging task, the highly versatile work platform Scheldemond I was called upon. Renowned on the river for its stability and adaptability, Scheldemond I proved instrumental in yet another key project’s success.
Using a bespoke mooring system, Scheldemond I was able to lock into position under the bridge, providing safe and stable access to the underside of the bridge at all states of tide. Two mobile elevated work platforms (MEWPs) were placed on deck, which enabled the painting team to safely and efficiently reach all required areas under the bridge.
Alongside her, we also deployed Artemis as the safety boat. Artemis’s shallow draft made her an ideal choice for operating in the restricted spaces under the bridge, ensuring the utmost safety for the crew during operations.
Owing to the bridge’s constant use during the day, the painting operation was conducted nightly over a 12-week period, demonstrating the commitment and efficiency of our team in managing extensive and time-sensitive projects.
We are proud to say the repainting of the bridge finished on schedule and, most importantly, without any safety incidents whatsoever. As always, it was a pleasure to be involved in maintaining the integrity and beauty of London’s essential river infrastructure.
ENQUIRE
VIEW MORE OF THE LIVETT'S PORTFOLIO
- All
- Civil Engineering
- Film & TV
- Marine Logistics
- PR & Consultancy
- Superyacht Agency
- Tugs & Towage
The End We Start From
The Boys In The Boat
Suspect – Series 2
The Union
Blitz
Sonic the Hedgehog 3
Back In Action
Mission: Impossible – The Final Reckoning
Shelter
Red Bull Tower Bridge Wingsuit Flight
The Family Plan 2
Avatar: Fire & Ash – River Thames Burning Sculpture
Barnes Bridge Maintenance & Strengthening Works
Hamnet – River Thames Filming
The Woman In Cabin 10 – Marine Filming
London Eye Capsule Renewal
Amphibious Land Rovers on the River Thames
Cannon Street Railway Bridge Repainting
Meg 2: The Trench – River Thames Megalodon PR Launch
Hennessy x NBA – Courts Beyond Limits
Burberry Floating Meadow
Gangs of London – Series 2
Burberry Olympia Handbag Launch
TAG Heuer – eFoil Launch
Pistol
Anatomy of a Scandal
Lockwood & Co
Liam Gallagher – Down By The River Thames
London New Year’s Eve Fireworks 2018
Amazon Prime – Premier League Launch
Baynard House – Water Cooling Intake Shaft Relocation
Adidas Football Creator Dock
Travis Pastrana’s Nitro Circus Motorcycle Backflip
EE 5G Launch – Stormzy on the Thames
Lady A & Lady M II
Lotus Eletre Launch
The Boat Race 2022
Jack Ryan – Thames Jump Stunt
Alexander McQueen – First Light
Red Bull Music Odyssey
CO2 Tanks Removal
Virgin Media – Be The Fastest Campaign Launch
British Masters Hero Challenge Golf
Gangs of London – Series 1
Jurassic World: Fallen Kingdom
Criminal
National Lottery – New Dawn For Lotto
London Fire Brigade – Thames Zip Wire
Microsoft – Make It Happen Event
Lucky Man
Tall Ships Festival 2017
Blackfriars Rail Bridge Reconstruction
Under Armour – Earn Your Armour
eBay – Floating Birthday Cake
Jaguar XE – Floating Thames Concert
Santander 123 World Golf Stunt
Airbnb – River Thames Floating House
Land Rover – Rugby World Cup Trophy Tour
Candy Crush Soda Saga – Product Launch